HOME 
    PAGE
   
  
    
      |   | 
        | 
        | 
        | 
        | 
    
    
      |   | 
             
        Sunday 11.00 am 
         
        17 September  2017  | 
             
                
          Kantza  | 
                
              AH3 
          Run 2007   | 
        | 
    
    
      |   | 
        | 
        | 
        | 
        | 
    
    
      |   | 
       
              Trail length 
              
  | 
         
      Hare 
        Fair Cop  | 
       
              Starting location: 
          37.982009°,             23.873098°   | 
        | 
    
    
      |   | 
        | 
        | 
        | 
        | 
    
  
  Photos: Waiting for 
    
    Web page: Mad Dog
   
  
  
    
  Trail as planned 
   
  
  Trail as planned 
   
  
  Trail as run 
   
   
  
    
      The directions to the hash - for the record   | 
    
  
   
  Sunday 17TH September – 11am
  Run 2007-ish....
  Hare: Fair Cop
  Venue: Starting from the church of Palaiopanagia, Kantza
  On Inn: to be confirmed.. 
  Directions:
  Attiki Odos from the Airport Direction. 
  Leave   Attiki Odos at Junction 17, Kantza. Turn right onto Papaggelaki street,   continue 50m, look for the church on your left on Papasideri street
  Attiki Odos from Elefsina Direction. 
  Leave   Attiki Odos at Junction 17, Kantza.  Turn right onto Leoforos   Paleopanagias, turn right at T junction onto Papaggelaki and go over the   bridge, continue for 400m. Look for the church   on Papasideri street on your left.
  Avoiding tolls: 
  Cough-up the €2.80 then follow directions above, or turn on Google Maps and use the link below, or take Lavriou Ave   to the roundabout in Glyka Nera, take the Kantza exit, turn right when   you can't go straight on at the T-junction, then follow this road over   the motorway, 400m beyond, church is on your   left.
  By Train: 
  Get   on an airport train, get off at Kantza. Come up to the road. Turn to   face the direction of the airport, and come down the road on your left.   About 400 metres.
  https://goo.gl/6YfB2z
  GPS coordinates   For Sat Navvies: 37°58'55.33"N, 23°52'22.97"E
  Lost? Still drunk from summer boozing? 
  Directionally challenged?? Just plain stupid????
  Call the hare: Fair Cop 6932096555